Promise Technology VessRAID 1000s Series Instrukcja Obsługi Strona 211

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 210
195
Chapter 6: Management with the LCD Panel
This chapter covers the following topics:
Using the LCD Panel (below)
Perusing the Interface (page 196)
Managing the Network Connection (page 198)
Managing SAS Connections (page 200)
Managing the Controller (page 202)
Managing Enclosures (page 203)
Managing Physical Drives (page 204)
Managing Disk Arrays (page 206)
Managing Spare Drives (page 215)
Using the LCD Panel
The LCD panel is optional and typically installed during VessRAID installation.
See page 11.
The LCD panel activates approximately 35 seconds after you switch on the
VessRAID’s power supply.
At first, the LCD screen displays
System is Initializing
.
When the VessRAID is fully booted and running under normal conditions, the
LCD screen displays the VessRAID model number and IP address, as shown in
Figure 1.
Figure 1. LCD default display
If the LCD panel displays Check Event, see “Chapter 9: Troubleshooting” on
page 265 for more information on diagnosing the issue.
Przeglądanie stron 210
1 2 ... 206 207 208 209 210 211 212 213 214 215 216 ... 339 340

Komentarze do niniejszej Instrukcji

Brak uwag